Fire Retardant Tarpaulin Installation Process
The installation process of fire retardant tarpaulin includes inspection, preparation, installation, and safety checks
Fireproof Tarpaulin Installation Process
1. Survey & Measurement
Assess the construction area, measure dimensions, and determine the locations where the fireproof tarpaulin needs to be installed.

2. Material Preparation
Prepare the fireproof tarpaulin, fixing frame, construction tools, and protective equipment.

3. Installation and Securing of the Tarpaulin
Install the tarpaulin in the determined location, using a fixing frame or hooks to ensure stability.

4. Joint Treatment
Joints need to be carefully reinforced to prevent gaps that could cause fire spread.

5. Inspection & Acceptance
Inspect the strength, heat resistance, and overall quality of the work.